← Archive · 6G Tracker
 

Daily Dose of 6G

GTP-U vs SRv6 vs QUIC: CT4’s user-plane contest

CT4’s two 6G core protocol studies already have long solution lists. The control-plane study lists ten SBI solutions, from HTTP/3 to agent-to-agent communication. The user-plane study puts GTP-U against SRv6 and QUIC, and the final choice is now expected in September 2027.

In 60 seconds

  • User plane: 4 key issues and 13 solutions (A–M). They range from enhancing GTP-U to replacing it with SRv6 or QUIC.
  • Control plane: 5 limitations of today’s SBI and 10 solutions, including HTTP/3 and agent-to-agent communication inside the core.
  • Postponed: the user-plane protocol decision moved from end-2026 to September 2027 (per 6G Futures).
  • Rapporteurs: Hao Jing (Huawei), control plane; Yong Yang (Ericsson), user plane.
CTCT4 · TR 29.841 v0.3.1

The user-plane options

Four key issues, one per candidate: GTP-U kept, SRv6 replacing GTP-U, QUIC under GTP-U, and QUIC replacing GTP-U. The solutions divide the same way:

DirectionSolutions
Enhance GTP-UA: GTP-U as candidate · B: IE encoding in header · C: path via UP list · D: message bundling · E: GTP-U source routing · F: in-band tunnel management · G: path-ID mapped UP list · H: on-path tunnel creation · I: SRv6-aware GTP-U
Replace with SRv6J
QUICK: QUIC under GTP-U · L: plain QUIC · M: QUIC with CONNECT-IP

Nine of the thirteen solutions enhance GTP-U rather than replace it. Rapporteur: Yong Yang (Ericsson). Work item FS_6G_UPCN_CT.

CTCT4 · TR 29.840 v0.3.1

Fixing the service-based interface

The control-plane report starts from five limitations of today’s SBI: the parameter passthrough bottleneck, static execution logic, filtering of resource representations on reads, API versioning in practice, and feature negotiation. Its ten solutions:

  • #1 HTTP/2 · #2 HTTP/3 · #4 HTTP/2 and HTTP/3 coexistence
  • #3 agent-to-agent communication protocol within the CN
  • #5 generalised SBI query filters · #8 flexible filtering of resource representations
  • #6 simplified API version control · #7 dynamic logical extension registration and discovery
  • #9 signalling of supported optional features · #10 API extension for parameter-passing optimisation

Rapporteur: Hao Jing (Huawei). Work item FS_6G_CPCN_CT. The scope ties the study to TR 22.870, TR 23.801-01 and TR 33.801-01.

CTCT#112 · per 6G Futures

The decision date moved

Postponed

Guy Daniels reports the user-plane protocol decision was deferred from end-2026 to September 2027, the same date the CT studies end.

RAN also depends on this choice: the RAN–core user-plane interface (today N3 over GTP-U) has to match whatever CT4 picks.

Watch next

  • CT4 Calgary (16–20 Nov): whether any user-plane options are dropped before the September 2027 decision.
  • SA2#178: the architecture choice may favour or rule out some transport options.

Sources

Report contents are read from FriendlySpec renders of the draft TRs. Drafts change at every meeting; nothing in a draft TR is agreed until its conclusions are.